HS2

Project overview

HS2 is Britain’s largest infrastructure project, designed to connect London and Birmingham via a high-speed rail network. It is the first new intercity railway built north of London in over a century and represents the most significant rail investment in the UK’s history. Spanning 140 miles, Phase 1 includes four new stations, two depots, 32 miles of tunnel, and 179 bridges, with trains reaching speeds of up to 225 mph.

Client

HS2 Ltd

Project owner

HS2 Ltd

WJ has been contracted by all of HS2’s construction partners across the entire route, providing expert water management solutions at 37 work sites.

Project Scope and Challenges

The scale and complexity required an extensive range of groundwater management services. WJ’s role spanned pre-construction and construction phases, delivering:

  • Groundwater Control & Dewatering – Installing and managing dewatering systems to maintain safe and dry excavation conditions.
  • Pumping Tests & Groundwater Treatment – Conducting tests to optimize water management strategies and treating groundwater to meet environmental regulations.
  • Instrumentation & Monitoring (I&M) – Providing real-time groundwater and surface water monitoring using advanced cloud-based systems.
  • Surface Water Management – Implementing strategies to prevent water accumulation and mitigate environmental impact.

With 29 contract packages delivered across multiple sites, WJ has played and continue to play a crucial role in maintaining safe working conditions and optimising construction timelines.

WJ’s Innovative Approach

WJ’s success was driven by:

  • Technical Expertise & Collaboration: Our experience in large-scale infrastructure projects ensured efficient and innovative water management solutions.
  • Multi-Disciplinary Water Management: Integrating dewatering, treatment, and monitoring for a comprehensive approach.
  • Cost and Carbon Savings: Value-engineered solutions reduced client costs, minimised carbon emissions, and improved efficiency.
A Key Contribution to the Success

WJ’s ability to adapt and deliver innovative water management services played a critical role in ensuring their construction remained on schedule. Our involvement helped maintain environmental compliance, improve efficiency, and optimise resources across multiple sites.

The WJ Difference

At WJ, we go beyond water management—we deliver innovative solutions that support large-scale infrastructure projects. The Phase 1 project showcases our expertise in integrating groundwater control, treatment, and monitoring to facilitate sustainable and efficient construction.