We engaged WJ Groundwater to drill the new ground source energy well at UCL as they had successfully installed an abstraction well at the same site in 2014. This section of the work required careful planning to align with the main site activities. The WJ team carried out the works on programme and worked well with the main contractor to ensure that this logistically challenging project was delivered successfully.
Iain Howley Director – University College London, Ground Source Consult Ltd
Dan Carpenter July 11, 2017 Share this post