In-Tunnel Dewatering for a Cross Passage in LondonWJ WhitepaperAbstract The Crossrail project in London comprises twin TBM driven railway tunnels. The scheme includes several short cross link tunnels between the TBM drives to house switch gear, sumps and for access. Cross passage CP6 is 14 m long and includes a central sump. This cross passage
Results for
sump pumping
Royal Hospital For Sick Children, Edinburgh
Dan Carpenter October 9, 2017WJ Groundwater is very proud to announce the launch of its new website for it’s Middle East operations in UAE and Qatar. We have been at large in the region since we opened an office in Dubai in 1999 and Doha in 2007, so we thought it the time was ripe to bolster our online
WJ Groundwater is currently working with Dutch Foundation to dewater a 2B+G+1+30 residential building in Doha, Qatar. The property is located in the Al Dafnah District, also known as the Diplomatic Area. The project consultant is LACASA (Qatar). The WJ Groundwater team led by Noel Melendez (Project Manager) and Vijayakumar (Site Engineer) is deploying a