Results for

sump pumping

5 Years at Kings Langley

This week, we celebrated 5 years in our Kings Langley home! We’re proud of the progress we’ve made since our move, and would like to share some of our fondest memories.

Passive Relief Systems

Passive Relief Systems Back to DewateringIt is sometimes possible to control excess pore water pressures in a confined aquifer below the base of a proposed excavation by using passive relief well systems. The passive wells are drilled in the base of the excavation before the excavation has reached the piezometric level in the aquifer. As

UAE Update – A Hole in One – Montgomorie Golf Course

‘A hole in one’ for WJ Groundwater who successfully drained a lagoon at the Montgomerie Golf Course in Dubai, UAE. We were set the challenge, by the main contractor Al Tayer Stocks and their subcontractor Ecocoast Contracting, to drain the golf course lagoon in one day so that a bund could be placed to allow

Construction Dewatering & Groundwater Control

Construction Dewatering & Groundwater ControlWJ offer a complete construction dewatering and groundwater control service, ranging from design, installation, testing, monitoring and management of both temporary and permanent dewatering solutions to a wide range of customers. To learn more about the types of construction dewatering and groundwater control systems available, please select a service type below.

Geotechnical Engineering for the Medway Tunnel and Approaches

Geotechnical Engineering for the Medway Tunnel and ApproachesWJ Whitepaper Publication Credentials AUTHORS: • Q. Leiper, BSc, MSc, CEng, FICE, FIHT, CGeol, FGS • T. Roberts, BSc, PhD, CEng, FICE, FGS, MC!WEM • D. Russell, BSc, MSc, PhD, CEng, MICE   DATE: 2000 Abstract The design and construction  of  the Medway immersed tube tunnel and approach structures

Multi-Aquifer Pressure Release in East London

Multi-Aquifer Pressure Release in East LondonWJ WhitepaperAbstract Two adjacent deep shafts in east London involved excavation to 30 m below standing groundwater level and required temporary control of pressures in the Lower Aquifer below the London Clay. Three distinct aquifer horizons were present comprising the Lambeth Group channel sands, Thanet Sand and Chalk. One of